Project Background
Work is underway to replace the floor in the curling rink at the Mission Leisure Centre.
What’s Happening
The existing floor, which was over 40 years old, had deteriorated significantly, with the piping system found to be in poor condition. The scope of work includes the complete removal and replacement of the floor, including the subfloor heating system. In addition, a new chiller will be installed to support the upgraded infrastructure and improve long-term operational reliability.
Construction Timeline
April 2025 – September 1, 2025
Prime Contractor
Alfre Horie Construction Ltd.